This great little project was done over two timeframes, with two very different stone styles and color schemes, and two separate installation professionals. The building was completed in the summer of 2012 and features our QuickFit stone in the Downstream color scheme. The sign was completed in 2015, features Hackett stone in Zinfandel, and was installed by Pride Masonry.